Design, excavation, base prep, and installation done right — compacted base, perfect drainage, and tight lines for long‑lasting paver work.
Typically 6–10" depending on soil & load, compacted in lifts for long‑term stability.
Yes — we set slopes to move water away from structures while keeping comfortable walking grades.