Driveways, walkways, steps, and repair/resurfacing. Clean forms, proper reinforcement, and smooth, durable finishes. Foundation parging that looks crisp and resists weather.
Foot traffic typically after 24–48 hours, vehicles after ~7 days depending on temps and mix.
Parging is cosmetic and protective; we can pair it with waterproofing if moisture is an issue.